In other words, as long as the marginal cost of producing the unit was not in excess of the price offered, that unit would be offered for sale. 换句话说,只要生产单位产品的边际成本没有超过所提供的价格,那种单位的产品就可供销售。
If the price bidding is only based on the generation cost, the unit will be compelled to shutdown frequently and the benefit space will be lost because of lacking of flexibility in price competing. 如果发电公司仅依据发电成本报价,在参与竞价上网时会因缺乏灵活性而造成机组被迫频繁停机和利润空间的浪费。
This paper discusses generation cost curves, unit price curves and incremental cost curves, and points out that there might be declining segments in thermal-power unit price curve. 讨论了发电成本曲线、价曲线和成本微增率曲线,指出火电成本单价曲线存在下降段。
This company all offers product for not including tax and transportation cost of the unit price, specific settlement and expenses can consultation. 本公司所有报价产品为不含税及运输费用之单价,具体结算及费用可以协商。
Purchase cost control is to purchase quantity and unit price of the stock control, focus on the purchase of the unit price control. 进货成本控制在于对进货数量和进货单价的控制,着重于进货单价的控制。
The supplier would presumably offer units for sale as long as the additional cost of producing each unit is less than or perhaps just equal to the price offered. 只要生产每一个单位产品的额外成本低于或者可能刚好等于所提供的价格,供应商则会大概提供用于销售的单位量。
The poorer the economic benefit of enterprise, the fast the speed of the increase of enterprise benefit caused by the reduction of variable cost of the product and the increase of unit selling price of the product owing to technical progress. 当企业经济效益越差时,技术进步使产品的变动成本降低或使产生的单位售价提高而带来企业收益提高的速度越快;
It can be concluded that the appliance of the System of Changed Circumstances is greatly limited in construction contracts through inspecting the connotation and risk-allocation of the pricing ways, such as cost and rewards, adjustable price, fixed unit price and fixed total price. 考察成本加酬金、可调价格、固定单价和固定总价等价款确定方式的内涵和风险分配,可以看到,在建设工程施工合同的基本面上,情势变更制度的适用受到极大限制。
The real object method is introduced for project cost determination. With analysis on the disadvantages of current norm unit price method the advantages of the real object method are elaborated as well as concrete operation in budget making. 介绍了实物法确定工程造价的方法,并对现行定额单价法的不足作了分析,阐述了实物法确定工程造价的优越性,提出编制预算具体的工作步骤。
In order to make the bidding more equitable and reasonable, equal price principle is used in bidding and start-up cost of unit allocation method is introduced to equal price principle, and price curve of units is corrected. 本文采用等报价法组织竞标,将机组启动费分摊方法引入到等报价竞价方法中,修正了机组的报价曲线,使竞价过程更为公平合理。
Along with the promotion and application of technologies, workmanship and new materials in hydropower construction, the configuration and shapes and structures of formwork have undergone great changes. The weight of cost of formworks in the unit price of concrete of hydroelectric project has changed accordingly. 随着水电建筑工程施工技术、施工工艺和新材料的推广及使用,作为措施项目的模板在形式和结构上发生了很大变化,模板费用在水电工程结构混凝土单价中的比重也相应发生了变化。
Secondly, after the international comparing of the main factors that affect the international competitiveness of wheat, it was discovered that Chinese wheat has the obvious cost advantage on unit product, while because of the high circulation fee, it results in inferior advantage on the price; 其次,通过对影响小麦国际竞争力的主要因素的国际比较发现:中国小麦单位产品生产成本具有明显优势,但由于较高的流通费用,导致在价格上不具有优势;
Through some examples, the paper also explains some problems that a project cost personnel must pay attention to when analyzing unit price and establish budget in order to provide reasonable unit price analyze and improve the quality of a project cost personnel. 通过一些实例说明工程造价人员在分析单价和编制预算时应注意的一些问题,以便提供合理的单价分析,提高工程造价人员的综合素质。
With regard to the above-mentioned, cost information of market materials and budget norm of engineering, etc. are introduced to calculate the engineering unit price of pipes with various diameters, and then through statistical analysis, the cost function of irrigation pipes is yielded. 针对以上问题,引入市场材料造价信息、工程预算定额等内容计算各种管径管道的工程单价,再经过统计分析得出灌溉管道造价函数。
The mathematics model for calculating initial building cost of spatial latticed shell structures is proposed by analyzing the structural constitutes and unit price of materials. 通过分析网壳结构的组成、材料单价,建立了网壳结构初始造价的计算模型。
Based on thorough analysis on the eight elements of generating cost, fixed cost and variable cost were calculated using dynamic cost disintegrated method, generation cost in different loads was obtained, the unit start-up costs was include into cost analysis and price biding as well. 首先,在深入分析火电厂发电成本各项构成的基础上,用动态成本分解计算的方法得出机组在不同负荷下的发电成本;并将机组启动成本考虑到成本分析与报价中来。
On the basis of depth analysis of the relation between unit variable cost and coal consumption, we have demonstrated that the unit variable cost can totally replace the coal consumption for on-grid sequencing with the planned coal price. 在深入分析机组变动成本与煤耗关系的基础上,论证了在计划煤价下,机组变动成本完全可以替代煤耗进行上网排序。